Material handling for Zob Ahan-e Pasargad’s phase II iron smelting development project

Material handling for Zob Ahan-e Pasargad’s phase II iron smelting development project


Portfolio Description

Client : Zob Ahan-e Pasargad
Client’s consultant : Aseen Foolad Engineering Firm
NSP’s Role Feasibility studies, preliminary and detailed design engineering, procurement, and inspection.
Contract Date : March 2017
– Feasibility studies of LAYOUT, PFD AND P&ID designs.
– Designing tanks with 12,000t and 450t capacities for direct reduced iron process.
– Designing Normal Belt and Side Wall Belt for direct reduced iron process.
– Lime, carbon, ferrosilicon and manganese storage tanks design.
– Preparing feeder, screen, winch, slider gate, etc. procurement documentations.
– Material handling system steel structures and foundations design.
– Material handling system construction, installation, and commissioning supervision.
– Electrical equipment and instrument procurement engineering.
– Automation and instrument design documents.
– Installation and commissioning of material handling systems electricity and instrument. Responsibilities