Update and improvement of Sangan Ore Complex safety systems

Update and improvement of Sangan Ore Complex safety systems


Portfolio Description

Client: Me’yar Sanat Khavarmianeh engineering co.

Client’s consultant: Kavoshgaran consultant engineers co.

Contract Date: November 2019

NSP’s Role: Checked the existing designs and optimized these designs through extensive FRA (Fire Risk Analysis) meetings to eliminate ineffective and inefficient systems and refined designs in accordance with the national and international mandatory design standards and consequently updated safety drawings and documents which resulted in cost reduction of €1.2m for the client.

Responsibilities:

– Studied all the existing documents, drawings and designs produced by the consultant engineer in detail.
– Carried out FRA studies and held risk analysis and extinction meetings with all the consultants and clients team members.
– Preparing drawings for the proposed changes and updating all safety drawings and documents and obtaining the client’s approval.